Project for the refurbishment and maintenance of various PEP production installations, including compression stations, separation units, storage and pumping stations, pipelines, well platforms, workshops, administrative buildings, administrative offices and other miscellaneous infrastructure. These activities are necessary for efficient and safe hydrocarbon production.
The purpose of these activities is to contribute to the optimisation, conservation and development of fields of the Gulf tertiary oil integral asset (states of Veracruz and Puebla).
The scope of the works includes construction, the refurbishment of existing facilities, and preventive and corrective maintenance of the aforementioned installations. This scope includes the following main works: