The Project consists in the implantation of a shadow toll system in the London A13 highway. The A13 forms part of regeneration of the Thames Gateway corridor. Besides, it supposes the main entrance-exit lane of the new financial centre of London: Canary Wharf.
The A13 project is pioneer inside of the shadow toll sector because of the payment is not only based in the data from the traffic detection and counting outstations, but also the images given by the CCTV cameras. It can be distinguished two main systems:
The particularity of this project is that some of the counting points are located in urban zones and they are susceptible of experiment traffic jams. SICE for this project has developed a new software that resolves this problem.